neocube Operating and installation instructions - models P/C
12
Installation of side parts
For the neocube system to look its best, it is essential that the upper and lower ceramic element/base ele- ment are visually connected by the ceramic side parts.
For this reason, the side part can be tilted and turned using the adjustment mechanism.
The precise setting of the alignment and height is carried out together with the installation of the upper ceramic element (from point 15).
Preparation: The flange nuts on the rear of the side ceramic elements are preassembled as follows. - upper side = two flange nuts per threaded bolt - lower side = one flange nut per threaded bolt
lower side = one flange nut per threaded bolt
upper side = two flange nuts per threaded bolt
neocube P / C – Operating and installation instructions
24
Made with FlippingBook flipbook maker